Aero Support Group

IGOM 15 and AHM 47 (2027): What Changes for Ground Handlers

By Ferhan Bugay, Executive Director, Aero Support Group · 16 November 2026

IATA has published the 2027 editions of its two core ground handling manuals: the IATA Ground Operations Manual (IGOM), 15th edition, and the Airport Handling Manual (AHM), 47th edition. The changes reach passenger acceptance, ramp safety, load control, SGHA terms and the AHM 1110 training programme. This guide lists them by chapter and sets out what ground handlers should update in their own manuals, training and contracts.

How IGOM and AHM fit together

IATA describes the two manuals as complementary. The AHM is policy driven and sets out what should be done. IGOM is procedure driven and sets out how to do it on the ground. Both feed ISAGO: station audits check passenger, baggage, ramp and load control procedures against IGOM, and the headquarters audit checks organisation, safety management and training against AHM provisions, including AHM 1110. A new edition of either manual is therefore a change for your Ground Operations Manual, your training programme and your next ISAGO audit.

What changes in IGOM, 15th edition (2027)

Chapter Change listed by IATA
1. Passenger handling Check-in, acceptance and travel document sections revised. Hand baggage and cabin baggage are now treated separately. Passenger security measures and arrival and transfer procedures expanded. The unruly passenger section is rewritten.
2. Baggage handling New baggage identification code. The mishandled baggage section gains subsections on baggage tracing, baggage taken in error, and lost and found items.
3. Aircraft ground handling Stricter PPE rules. A no-touch rule for ground equipment not designed to contact the aircraft. Brake checks become mandatory in equipment restraint areas. New passenger boarding bridge safety provisions. Forklift use limited to heavy loads. Guidance added for sandstorms, heavy rain and flooding.
4. Load control and aircraft loading Power lead lanyard attachment clarified. Door operation signals standardised. New controls for main deck cargo door sill guards. “OIR” replaced by “Unloading Instructions”. Final cargo hold inspections become mandatory. “Taxi out” becomes “Open Ramp” in pre-departure terminology.

What changes in AHM, 47th edition (2027)

Chapter Provision Change listed by IATA
1. Passenger handling AHM 121, AHM 123 Revised definition of inadmissible passengers (INAD). New guidance on biometric handling in contactless travel.
3. Cargo AHM 370 Interactive cargo section substantially revised to align with the Temperature Control Regulations and Perishable Cargo Regulations.
5. Load control AHM 505, 510, 537 Aircraft markings identifying ULD positions. New baggage category “Transit Long (BL)”. Stricter ballast requirements covering weight limits, marking materials and maintenance.
7. Aircraft movement AHM 732, 780 Delay code procedures updated in the process matrix, with matching updates to aircraft movement messages.
8. Ground handling agreements Chapter 8, AHM 812 SGHA provisions clarified for passengers with disabilities and third-party ULD ownership and control. Updates on amendments, force majeure, additional services, security, crew services and ULD management. New template for Annex B amendments.
9. Ground support equipment AHM 904, 908, 908A, 908B, 913, 920 Requirements for autonomous GSE and geospatial specifications. New equipment categories with and without human involvement. GSE compatibility across aircraft types clarified. Revised precision throttle controls.
11. Training AHM 1110 Training programme updated with revised requirements, job roles and modules. New modules for cargo warehouse handling, ULD build-up, freighter loading supervision, fuelling and defuelling coordination, potable water and lavatory services.

What ground handlers should update

Area What to do
Ground Operations Manual Compare each changed IGOM procedure with your own. Adopt it, or record a variation with the reason: ISAGO expects you to align with IGOM where feasible or declare a variation.
Ramp safety Update procedures, briefings and risk assessments for PPE, the no-touch rule, brake checks in equipment restraint areas, boarding bridges, forklift use and severe weather.
Load control and cargo Add the final cargo hold inspection and sill guard controls to loading procedures. Check that load documents and systems use “Unloading Instructions”, the BL baggage category, the new ULD position markings and the ballast rules.
Passenger services Review check-in and document checks, the split between hand and cabin baggage, unruly passenger handling and any biometric processes you run.
Training Map the revised AHM 1110 roles and modules against your training programme and add the new modules that match the services you provide.
Contracts Review your SGHA and Annex B against the updated AHM Chapter 8 provisions, and use the new Annex B amendment template where it fits.
Systems Update delay code handling and movement messages in departure control and messaging systems.
Safety management Treat the move to the new editions as a change under your SMS: assess the risks, plan the training, and record the date from which each new procedure applies at each station.

What it means for ISAGO

ISAGO checklists mirror the IGOM, AHM and ICHM requirements. Before an audit, your gap analysis and self-assessment on IATA’s Operational Portal need to reflect the editions that apply on your audit date, with every variation declared. Check with IATA which edition your audit will use, and plan the manual and training updates so that staff at each station work to the new procedures before the auditor arrives. Our ISAGO audit checklist sets out what auditors check at headquarters and at stations.

Where to start

  1. Get the 2027 editions and list every change that applies to your services and stations.
  2. Run a gap analysis of your Ground Operations Manual against IGOM 15 and decide, for each change, whether to adopt it or declare a variation.
  3. Update the training programme against the revised AHM 1110 and schedule the training.
  4. Review the SGHA and Annex B with your airline customers.
  5. Assess the change under your SMS and set an implementation date for each station.

How ASG can help

ASG prepares ground handlers for ISAGO, runs IGOM and AHM gap analyses of Ground Operations Manuals, and delivers ground operations and AHM 1110 training. Write to info@aerosupport360.com.

References

Frequently asked questions

IATA lists both as 2027 editions. Check the effective date IATA gives with your copy, and confirm which edition your next ISAGO audit will use.

IATA describes the AHM as policy driven, setting out what should be done, and IGOM as procedure driven, setting out how to do it. ISAGO station audits use IGOM; the headquarters audit uses AHM provisions such as AHM 1110.

ISAGO expects ground handlers to align with IGOM where feasible or declare a variation. Each variation should be recorded with its reason and declared in the gap analysis on IATA’s Operational Portal.

The 47th edition updates the training programme with revised requirements, job roles and modules, and adds modules for cargo warehouse handling, ULD build-up, freighter loading supervision, fuelling and defuelling coordination, potable water and lavatory services.