MAINTENANCE · By Ferhan Bugay, Executive Director, Aero Support Group FZCO · 20 November 2026
What is the rule and when does it apply?
| Title | Inspection Programs for Single-Engine Turbine-Powered Airplanes and Unmanned Aircraft; and Miscellaneous Maintenance-Related Updates |
| Docket / RIN | FAA-2024-0025 / 2120-AL20 |
| Amendments | 91-385, 125-78, 135-150, 137-18, 145-34 |
| Published | 10 November 2026 (Federal Register document 2026-22953) |
| Effective | 11 January 2027 |
The rule follows a proposal published in January 2024.
What changes for inspection programs under Part 91?
Until now, Part 91 single-engine turbine airplanes could only use an annual, 100-hour or progressive inspection. Turbine-powered rotorcraft have had more options since 1989. The rule splits 91.409(e):
- 91.409(e)(1): large airplanes, multiengine turbine airplanes and unmanned aircraft must follow life-limited part replacement times and inspect under a program selected under 91.409(f).
- 91.409(e)(2): turbine rotorcraft and single-engine turbine airplanes may elect a 91.409(f) program instead of the annual, 100-hour or progressive inspection.
The 91.409(f) options are a program that is part of a continuous airworthiness maintenance program (CAMP), an approved aircraft inspection program under Part 135, the manufacturer’s current recommended program, or a program established by the owner or operator and approved by the FAA under 91.409(g). The owner selects one program, records it, keeps a copy available to the person doing the inspections and complies with life-limited part replacement times. Manufacturers are not required to publish a program.
Other Part 91 changes clarify alternatives for complying with airworthiness limitations (91.403(c)), the handling and placarding of deferred inoperative items (91.405), and give fractional ownership program managers 96 hours instead of 72 to submit service difficulty reports under 91.1415, with electronic submission allowed.
What changes in Parts 125, 135 and 137?
- 125.247(e) lists the inspection programs that may be authorized: a current Part 121 or 135 CAMP, the manufacturer’s current recommended program, or a certificate holder program approved by the FAA.
- 135.411(a)(2) states that aircraft with 10 or more passenger seats are maintained under a CAMP. Unmanned aircraft under Part 135 follow the Part 91 inspection options.
- Part 137: the 100-hour or annual inspection requirement for agricultural flights over congested areas moves into 91.409.
What changes for Part 145 repair stations?
- 145.109(d): documents and data needed for the work must be kept in a format acceptable to the FAA and be accessible when the work is done. The itemised list and the word “current” are removed.
- 145.201(a)(2): a repair station may arrange for another person to perform maintenance, preventive maintenance or alterations, and approve that work for return to service if it is rated for the article and meets 145.217.
- 145.211(c)(1)(v): the quality control system must establish and maintain technical data for maintaining articles. “Current” is removed here too.
- 145.217: for contracted work, the FAA must approve the function, and the repair station keeps the functions contracted with each outside source’s name, certificate type and ratings. Before approving work by a noncertificated person, it verifies by test, inspection or both that the work was done satisfactorily and the article is airworthy.
The removal of “current” from Part 145 does not change Part 43. Work must still follow the methods in the current manufacturer’s maintenance manual or instructions for continued airworthiness, or other methods acceptable to the FAA, under 43.13(a).
What should repair stations and operators do before 11 January 2027?
- Repair stations: revise the repair station and quality control manuals for technical data control and contract maintenance, and update the list of FAA-approved contracted functions and outside sources.
- Repair stations: write or check the procedure for verifying work done by noncertificated persons, with the records that prove it.
- Operators of single-engine turbine airplanes: decide whether a 91.409(f) program suits your utilisation, and record the choice in the maintenance records.
- Buyers, lessors and CAMOs: check which inspection program an aircraft follows and how its records show compliance.
- Part 135 and UA operators: confirm that your inspection program reference and operations specifications match the new structure.
One calendar. Every regulator. See all upcoming IATA, ICAO, EASA, FAA and UK changes in our Regulatory Calendar. Watch the two-minute video.
How ASG supports FAA repair stations
ASG helps repair stations in and outside the United States obtain and keep FAA Part 145 certificates, including the manual revisions this rule calls for. See our FAA Part 145 repair station consulting. For other FAA changes, see our article on FAA SMS for Part 135 operators.
Frequently asked questions
No. Owners and operators may use a manufacturer program if one exists, or another 91.409(f) option, including their own program approved by the FAA.
Part 145 no longer uses the word “current” in 145.109(d) and 145.211(c)(1)(v), but 43.13(a) still requires the methods in the current manufacturer’s maintenance manual or instructions for continued airworthiness, or other methods acceptable to the FAA.
Part 145 applies to every FAA-certificated repair station, including those located outside the United States, so their manuals need the same review.
Updating your repair station manual?
ASG reviews repair station and quality control manual procedures for technical data control and contract maintenance before 11 January 2027.
Aero Support Group (ASG) is an aviation safety, quality and compliance consultancy with offices in Dubai and Istanbul and a branch office in London. It prepares airlines, MROs, ground handlers, airports and civil aviation authorities for IOSA and ISAGO audits, EASA and UK CAA Third Country Operator (TCO) authorisation, EASA and FAA Part-145 approval, and ICAO USOAP audits.
Its work also covers Part-CAMO, Part-M and Part-147, Part-IS information security, SMS, QMS and SeMS development, gap analyses, mock audits and corrective action plans, operations manuals and MOEs, emergency response and business continuity planning, DAQCP, IFQP, JIG and IDQP inspection preparation, ACC3, RA3 and KC3 cargo security validation, CEIV Pharma, and SAF and CORSIA compliance.
ASG has completed 1,000+ projects at 500+ airports in 100+ countries. Its consultants have also served as subject matter experts, auditors and advisors for ICAO, IATA Consulting, IATA audit pools (IOSA, ISAGO, IDQP, IFQP), PRISM, ARGUS International and RSM.
References
- Federal Register, Inspection Programs for Single-Engine Turbine-Powered Airplanes and Unmanned Aircraft; and Miscellaneous Maintenance-Related Updates (2026-22953, 10 November 2026)
- Federal Register, Notice of proposed rulemaking (2024-00763, 31 January 2024)
- eCFR, 14 CFR 43.13 Performance rules (general)
- ARSA, Comparison of Part 145 changes in the final rule